Back to Blog

2026-06-28

PAT Testing for Construction Sites - What You Need to Know

PAT testing for construction sites explained. What is required, how often to test, and what it costs. Professional PAT testing from Green Tag.

Construction sites are high-risk environments for electrical safety. Power tools, extension leads, and temporary equipment are subject to extreme wear. The IET Code of Practice recommends PAT testing every 3 months.

What Appliances Need Testing in a Construction Site?

Any portable electrical appliance that has a plug needs PAT testing. In a typical construction site, this includes:

  • Kettles, microwaves, and kitchen appliances
  • Computers, monitors, and printers
  • Phone chargers and extension leads
  • Heaters and fans
  • Any specialist equipment with a plug

How Often Should a Construction Site Be PAT Tested?

The IET Code of Practice provides guidance on testing frequency based on the type of equipment and the environment. For most construction sites, annual testing is recommended. Higher-risk environments may require testing every 3–6 months.

Is PAT Testing a Legal Requirement for Construction Sites?

There is no single law that mandates PAT testing by name. However, the Electricity at Work Regulations 1989 and the Health and Safety at Work Act 1974 require that all electrical equipment is maintained in a safe condition. PAT testing is the recognised way to demonstrate compliance.

What Happens During a PAT Test?

Each appliance undergoes a visual inspection followed by electronic testing using calibrated equipment. We check for damage, measure earth continuity and insulation resistance, and verify the appliance is safe. Appliances that pass are labelled with a test date and next test due date.

PAT Testing Prices for Construction Sites

  • Up to 10 appliances: £59
  • 11–50 appliances: £99
  • 51–100 appliances: £149
  • 100+ appliances: Contact us for a bespoke quote

Book PAT Testing for Your Construction Site

We work around your schedule to minimise disruption. Most construction site PAT tests are completed in 1–3 hours with digital certificates. Get in touch for a free quote.


Need a PAT Test in Greater Manchester?

Based in Salford, covering all of Greater Manchester. From £59, digital certificates.

You Might Also Like

2026-01-15

Electrical Safety Checklist for New Businesses

Complete electrical safety checklist for new business owners. PAT testing, fixed wiring, and compliance requirements exp...

Read More

2026-03-01

What Happens During a PAT Test? Step-by-Step Guide

Step-by-step guide to what happens during a PAT test. What we check, how long it takes, and what you receive afterwards....

Read More

2026-05-08

PAT Testing in Radcliffe - Covering Whitefield, Stand & Outwood

Professional PAT testing in Radcliffe from £59. Covering Whitefield, Stand, Outwood, Black Lane & Spring Lane industrial...

Read More